For re-installation
Preparations before lifting
Erection of scaffolding platform
At the appropriate height, relative to the weight of two rail bracket hoisting rope tied in a rope hanging down the center of the chain hoist
Heavy lifting before, you need to remove the side of the shoe
If the shoe for roller, to four guide shoes are removed
Hoisting heavy framework
Hand pull hoist will hang heavy frame to the appropriate height
Make the shoe fit the side rails and maintain contact
In heavy bumper mounting positions on both sides of each branch of a 100 × 100mm wooden
Square wooden seat height = height + buffer buffer overrun distance height +
Gently pour relax chain, so that heavy aircraft smoothly securely mounted on wooden poles
Both sides were not loaded when the shoe's on the heavy wooden frame fixed on, both sides should make the frame and guide rail end and an equal distance
Counterweight guide shoe installation, adjustment
Installation guide shoe
When the sliding guide shoe lining and installation to ensure the rail end clearance, under identical
Roller guide shoe installation to be smooth, the two sides of the wheel after wheel rail should equal the amount of compression of spring, compression size should be specified by the manufacturer.
If no provision is based on the use of moderate pressure adjustment, front wheel should face pressed rail, wheel centering rail center.
Installation and fixed weights of
Installation on weight
Installed according to the manufacturer to design requirements for weight clamping device.
Clamping device to prevent the weight of the weight issue in the elevator when the collision sound
In addition to the top wire type, as well as baffle, top tube type two clamping device
Compensation pier installation
Under heavy collision at the plate should be installed to compensate pier