木屋配音为您推荐一篇解说词,这篇文案是由木屋配音老师倾心演绎。如有配音需要请联系QQ:715006566 或者致电配音热线:0431-85929883
Layer door installation
Installation sill
According to the sample line annotation layer in the Layer entrance door opening width of the center line and net line
Before installation, first in layers on the door sill to draw floor door opening width of the center line and net line
If the bracket for concrete structures, rinse with water, will be installed on the ridge paw the ground
Steady release sill, so crossed the baseline on the ground crossed the hall door sill align
Sample line distance measurement between the sill and to meet the standards
Door sill line transect distance of 30mm, maximum of 35mm
Scene with a fine stone concrete pouring
The steady release sill use leveling foot level
After stabilizing the sill above the ground after the renovation should be 2 ~ 3mm
If there are no concrete corbels on embedded iron welded frame, steel bracket installed to stabilize the sill
1000kg rated load and below the various types of elevators, can not do less than 65mm edge angle brackets, welding, and steady loading sill. Corbel brackets least 3
Elevator above 1000kg rated load in various types of elevators, can be 10mm thick steel and channel steel production corbel brackets, welding, corbel brackets least 5
If the floor at the door sill neither concrete nor embedded iron corbels, using M14 expansion bolt bracket above bracket, make steady loading sill.
Door installation, door unit
Bolt the post and lintel assembled to form the Door.
Door in place and connected to ground planes Canto
With lines fall and ruler measurements Door vertical, full-height should correspond to the vertical agreement
Connecting plate or welded steel Door manner mounted on the wall layer hoistway door, door pockets on each side, middle and lower three fixed
While ensuring that the front and rear door pockets, vertical error of no more than about 1/1000.
The device is fixed on the door above the door Door Fittings
Measuring points in the left and right door rails
Measuring the verticality of the hall door sill.
Pine door opener unit above the mounting plate bolts
Make contact with the wall mounting plate with the mounting plate bolts in the wall of the well.
Installation hall door, adjust Tingmen
Bolted the door and the door siding
In the lower door installation door guide shoes, the shoes into the door sill slots in between the doors and 6mm thick sill mat support.
Conducted between the door and the doors siding with special shimming, so as to meet the requirements, then the door siding and door fastening screw connections
The eccentric transferred back and slide spacing of less than 0.5 mm
Removed the doors and the sill between the pad thing
Gate taxi tests, to brisk freely for qualified
Two front doors deviation should be less than 0.5mm, when the hall door shut both doors space no larger than 6mm. Doors and sill gap should be between 1 ~ 6mm
Door and door gaps should be between 1 ~ 6mm
Lock adjustment
Door Locks and Door adjustment layer safety switch, to reach the latch hook flexible action until proven electrical safety device locking action, the minimum length of engagement of the locking element is 7mm
Forced closing devices installed
When the floor doors open, in the absence of external force, landing door automatically closes smoothly
Layer apron door installation
Layer steel door sill under bracket, you should install 1.5mm thick steel apron, the width of the steel plate should extend over each layer on both sides of the gate width 25mm, the vertical height of not less than 350mm, the following should be the next extension of an inclined plane , so that the angle between the inclined surface and the horizontal plane of not less than 60 °, its depth is not less than the projection 20mm.
配音业务洽谈QQ:715006566 配音服务热线:0431-85929883
下一篇:【沈阳】牵引绳的安装解说词
特价配音